电脑桌面
添加安全生产网—安全人的学习资料平台到电脑桌面
安装后可以在桌面快捷访问

Green Lift Checklist(Overhead crane)起重作业安全检查表(天车桥吊).pdfVIP专享VIP免费优质

Green Lift Checklist(Overhead crane)起重作业安全检查表(天车桥吊).pdf_第1页
1/1
中海福陆重工有限公司安全吊装检查表 CFHI Green Lift Checklist Location 地点 Date 日期 Description of Load 吊物描述 Crane Model 吊机型号 Weight of Load 吊物重量 Overhead crane capacity 天车桥吊负载能力 Weight of Rigging and Crane Block 吊索具和起重机吊钩重量 Hook block capacity 吊钩负载能力 Total Erection Load 吊装总载荷 Hoist line capacity 吊机钢丝绳负载能力 Percent Crane Capacity 吊机利用率(最大起重机能力百分比) 要求的吊索具-尺寸和能力 RIGGING GEAR REQUIRED – SIZE AND CAPACITY Shackles 卸扣 Spreader 吊杠或撑杆 Slings 吊带或钢丝绳 Tailing Hook-Up 辅助吊机能力 被吊物和吊耳 LOAD AND LIFTING LUG 1. Has the weight of the load been documented or accurately calculated? 吊物重量是否有精确的计算或相关的证书或文件记录? 2. Are all items that will be lifted with the equipment included in the weight? 是否所有被提升的设备装置都被包括在吊装重量中? 3. Have the lifting lugs that will be used to lift the load been designed for that purpose? 用于提升载荷的吊耳是否经过设计用于吊装? 4. Will the lifting lugs be used with the correct shackle? (Pin Diameter no less that 90% of hole diameter) 吊耳是否与适当的卡环一起使用?插销直径不小于孔径 90% 5. Will the lifting lugs be loaded only in the strong direction(s) of the lug? 吊耳是否被安装在吊耳承受力最抢的方向或位置? 6. Are the lifting lugs visibly free of defects or damage? 目测检查吊耳是否无缺陷或损坏? 7. Has the load been checked for loose or unsecured items, which might fall off during the lift? 是否检查可能在吊装过程中坠落的松散或未固定物件? 8. For a one-crane lift will the crane hook be over the center of gravity at the initial pick? 对于单台吊机吊装,吊机吊钩是否在初始提升点的重心上方? 吊索具 RIGGING GEAR 9. Have the capacities of the slings and shackles been checked for the load? 吊索具和卡环能力是否经过检查? 10. Have the slings and shackles been visually inspected for defects or damage? 吊索具和卡环是否目测检查缺陷或损坏? 11. Have the sling angles been considered when checking the capacity of the slings and shackles? 检查吊索具和卡环能力时是否考虑吊索具布置的角度? 12. Has the center of gravity been considered when checking the capacities of the sling and shackles? 检查吊索具和卡环能力时是否已经考虑重心位置? 起重机 CRANE 13. Is the load greater than 5 tons and greater than 50% and < 75% of the crane chart capacity? 载荷是否大于 5 吨且大于吊机表能力 50%<小于 75%? 14. Has the crane received a daily inspection and operational check by the operator? 吊机是否接受日常检验?司机是否对吊机运行状况进行检查? 15. Is the crane set up according to the manufacturer’s specification? 是否按照说明书安装布置? 16. If there is electrical hazards(energized power line) or Other External Hazards? 是否有电气危险(通电电缆)或其他的外部风险? 17. Have hook block, hoist line and drum been checked ? 起重机吊钩、滚筒、钢丝绳都完好无损? 18. Is the load greater than 50 tons? 载荷是否大于 50 吨? 吊装过程 LIFT 19. Has the hook block clearance checked? 吊钩移动的路径空间经过了检查? 21. Has the load movement route been cleared and free of obstruction? 吊物移动的空间经过检查且没有障碍物 20. Have all person near the lifting area been warned and removed? 是否警示并清除吊装作业区域和吊机吊物周围的人员? 21. Has the clearance between the load and shop facilities/structures been checked? 吊物和车间设施或结构之间的距离空间经过了检查? 23.Is there any possibility to side load the overhead crane? 是否有可能导致天车桥吊侧向负载? 22. Has one person been designated “Signalperson-in-Charge” for the lift? 是否指定专门的司索指挥人员负责吊装作业? Note: All questions should be answered yes, no, or N/A (not applicable). The Rigging Supervisor must assess and approve any checklist item answered by “no” before the lift commences. 注:所有问题均应回答是、否或不适用(不适用)。吊装经理或监督必须在吊装作业开始前查阅并批准回答为“否”的任何检查表项目。 现场起重司索指挥 Field Rigger 起重机司机 Crane Operator 起重主管/监督 Lift/Rigging Supervisor

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

Green Lift Checklist(Overhead crane)起重作业安全检查表(天车桥吊).pdf

确认删除?